Construction Bill Format: Contractor and RA Bill Template

A construction bill format for contractors: running account (RA) bills based on measurement, labour bills, retention and advance recovery, with GST and a free template.

How contractors bill

Construction work is usually billed in stages through running account bills: RA Bill 1, RA Bill 2 and so on, each based on measured work done to date at the agreed rates, less what was billed before. The final bill closes the account.

Each RA bill typically shows: work done to date, previous bills, this bill amount, deductions such as retention money and mobilisation advance recovery, tax, and net payable. Attach a measurement sheet signed by the site engineer.

What to include

Contractor RA bill sample

Retention and advance recovery are usually shown in a statement below the invoice. The tax rate depends on the type of work.

Construction bill

TAX INVOICE (RA BILL 3)

Shivam Constructions
Thaltej, Ahmedabad 380059
GSTIN: 24ABJFS1122G1Z0 | State: Gujarat (24)
Bill No.: RA-03
Date: 14 Oct 2026
Period: Sep 2026
Place of supply: Gujarat (24)

Bill to: Neelkanth Builders LLP
Ahmedabad
Work order WO-NB-17, Neelkanth Heights

#DescriptionHSN/SACQtyRateTaxable valueGSTAmount
1BOQ 4.2: RCC M25 slab, 2nd floor995411182 sq m1,450.002,63,900.0018%3,11,402.00
2BOQ 6.1: Brick masonry 230 mm99541164 cu m5,200.003,32,800.0018%3,92,704.00
Amount
Taxable value₹5,96,700.00
CGST @ 9%₹53,703.00
SGST @ 9%₹53,703.00
Total₹7,04,106.00

Amount in words: Rupees Seven Lakh Four Thousand One Hundred Six Only

For Shivam Constructions

Authorised Signatory

Use this templateEdit it in the free maker, then download PDF, Word or print. Runs in your browser.
Use this template

Labour bill format

Labour contractors bill by man-days or by measured work: “Mason, 26 days at 900”, “Helper, 52 days at 600”. Keep attendance sheets as proof. If you only supply labour, say so clearly on the bill.

Download in Word, Excel or PDF

All files are free to use and edit. Yellow cells in Excel are inputs; totals are formulas.

Tips

Do

  • Attach the signed measurement sheet.
  • Quote the BOQ item number.
  • Show cumulative and previous quantities.

Avoid

  • Do not bill more than measured work.
  • Do not forget retention and advance recovery.

Frequently asked questions

What is an RA bill?

A running account bill: an interim bill for work done to date in a contract, paid in stages before the final bill.

Which GST rate applies to construction?

It depends on the type of construction and the contract. Ask your accountant for the rate on your work.

Checked and updated 14 Oct 2026. Independent template site; not tax or legal advice.